Update 10/7/2019 The concrete foundations of this new building have recently been poured. This is what shapes the basis for,…
Update 10/7/2019
The concrete foundations of this new building have recently been poured. This is what shapes the basis for, a.o., the cleanroom space (225 m2), a prototyping assembly space (220 m2) and an optical lab (150 m2).
Read more about NTS and follow the progress they are making.